Current Project Notices
5/21/2026 - Request for Proposal Issued for Procurement and Implementation of Computerized Asset Management System
Active Engineering Projects
Project Designations
New Project was updated within the last 60 days
Consultant Project will request consultant proposals
Contractor/Supplier Project will request contractor/supplier bids/proposals
Building Construction
JVWTP Chemical Building HVAC Upgrades
JVWTP Wash Water Reclaim Pump Station #2 HVAC Upgrades
Maintenance North Campus
Consultant
Contractor/Supplier
Corrosion Protection
Electrical
Engineering Studies
Comprehensive CIP Development Process
Computer Maintenance Management System Notice of Intent for Demonstrations
Contractor/Supplier
Digital Twin Pilot at SERWTP
Engineering Services for the Water District Water Development Council
JWVCD Asset Management Planning
Procurement and Implementation of Computerized Asset Management System
Consultant
Contractor/Supplier
General SOQ
2026 Request for General Engineering Statements of Qualifications
Consultant
z-Temporary File Transfer URL
Landscaping
Maintenance
32 & 62 P-2 Pump Rehabilitation
Consultant
Contractor/Supplier
3200 W 6200 S 8 MG Reservoir Asphalt Replacement
Contractor/Supplier
Complete Dump Truck Purchase Contract
New
Consultant
Contractor/Supplier
Distribution Pipeline Critical Parts
Consultant
Contractor/Supplier
Finished Water P-3 Motor Rehabilitation
Consultant
Contractor/Supplier
Lawn Care Grounds Maintenance
Consultant
Contractor/Supplier
Natural Terrain Maintenance
Consultant
Contractor/Supplier
Service Body Purchase and Installation Contract
Consultant
Contractor/Supplier
Transmission Pipeline Critical Parts
Consultant
Contractor/Supplier
Vault Painting Group 2
Water-wise Grounds Maintenance
Consultant
Contractor/Supplier
Pipeline
2026 Distribution Pipeline Replacements - Millcreek Area
Contractor/Supplier
JA-2 Flow Control Vault Improvements
Contractor/Supplier
JA-3 2800 S Blowoff Improvements
Contractor/Supplier
Jordan Aqueduct Cylinder Wall Spot Repairs
Consultant
Jordan Aqueduct Seismic Resilency Study
Contractor/Supplier
JVWTP Backwash Outlet Valve Replacements
Contractor/Supplier
Rosecrest Pipeline Capacity Upgrades
Southwest Aqueduct Reach 2
State Street Pipeline Replacement
Contractor/Supplier
Pump Station
3145 W 11400 S Pump Station Improvements
Contractor/Supplier
5700 West 10200 South Booster Pump Station Upgrades
JNPS Valve Replacement
Reservoir
Sole Source Procurement
Structural
Treatment
Casto and Dry Creek Springs Treatment Plant
Contractor/Supplier
JVWTP Basins 1-2 Seismic and Capacity Upgrades
Consultant
Contractor/Supplier
JVWTP Filter and Chemical Feed Upgrades
SERWTP Disinfection Concentration-Time Improvements
Contractor/Supplier
SWGWTP Chemical Feed Modifications
New
Contractor/Supplier
SWGWTP Finished Water Vault HAVC Upgrades
New
Contractor/Supplier
Utah Lake / Jordan River Treatability Study
Consultant
Contractor/Supplier