JA-2 Flow Control Vault Improvements
Project Information
Project Name
JA-2 Flow Control Vault Improvements
Project Type
Pipeline
Project Manager
John Kahle
Project Description
This project includes replacing two 30" venturi style flow meters, two 30" butterfly valves with actuators, one 42" venturi flow meters, and one 42" butterfly valve with actuator. This work will involve modifications to the existing piping all located inside an underground vault. Along with the work at the flow control structure, a 66" outlet valve also located at the terminal reservoir will be replaced with a new actuator.
Estimated RFP Release Date
N/A
Consultant
Owner
Estimated Bid Documents Available
September 2025
Bids Due
10/28/2025
Contact/Planholders List
This list includes engineers, contractors, subcontractors, suppliers, and others associated with this project. You MUST sign up to receive addenda and revisions, project notifications and other project information.
Public Notices
10/17/2025 - New Addendum
Addendum #3, with revisions to the bid due date has been posted. Bids will now be due October 28 at 3:00 pm.
10/16/2025 - New Addendum
Addendum #2, with revisions to the drawings and specifications is now available on the website. The Bid Due date and time remain unchanged.
10/13/2025 - Bid Documents Addendum
Addendum #1, answering questions from the pre-bid meeting and revisions to the drawings and specifications is now available on the website. The Bid Due date and time remain unchanged.
9/29/2025 - Bid Documents Available
Bid Documents for the project titled JA-2 Flow Control Vault Improvements are now available on the districts website.
Contract Documents and Project Information
Date | Type | Description | Download |
---|---|---|---|
10/17/2025 | Addendum | Addendum #3 | Download |
10/16/2025 | Addendum | Addendum #2 | Download |
10/13/2025 | Addendum | Addendum #1 | Download |
10/7/2025 | Planholders List | Pre-Bid Meeting Sign In Sheet | Download |
9/29/2025 | Bid Documents | Bid Documents | Download |
9/29/2025 | Bid Documents | Technical Specifications | Download |
9/29/2025 | Drawings | Drawings | Download |