JVWTP Backwash Outlet Valve Replacements

Engineering project details, documents, and contact information can be found below.

JVWTP Backwash Outlet Valve Replacements

Project Information

Project Name
JVWTP Backwash Outlet Valve Replacements
Project Type
Pipeline
Project Manager
John Kahle
Project Description
This work includes replacing two 36” butterfly valves located on the outlet structure of the backwash reclamation ponds at the Jordan Valley Water Treatment Plant (JVWTP). The work also includes running a new conduits to provide power to new outlet receptacles.
Consultant
Owner
Estimated Bid Documents Available
February 2026
Construction Contract Date
3/11/2026
Bids Due
2/23/2026 1:30 PM
Estimated Construction Cost
$100,000

Contact/Planholders List

This list includes engineers, contractors, subcontractors, suppliers, and others associated with this project. You MUST sign up to receive addenda and revisions, project notifications and other project information.

Download List

Public Notices

2/2/2026 - Bid Documents Available

The bid documents for the Jordan Valley Water Treatment Plant Backwash Outlet Valve Replacement project are now available on the JVWCD website. Bids are due on February 23, 2026 at 1:30 pm.  

Contract Documents and Project Information

Date Type Description Download
2/3/2026 Bid Documents Specifications Download
2/2/2026 Drawings Drawings Download
2/2/2026 Bid Documents Bid Documents Download