JVWTP Backwash Outlet Valve Replacements
Project Information
Project Name
JVWTP Backwash Outlet Valve Replacements
Project Type
Pipeline
Project Manager
John Kahle
Project Description
This work includes replacing two 36” butterfly valves located on the outlet structure of the backwash reclamation ponds at the Jordan Valley Water Treatment Plant (JVWTP). The work also includes running a new conduits to provide power to new outlet receptacles.
Consultant
Owner
Estimated Bid Documents Available
February 2026
Construction Contract Date
3/11/2026
Bids Due
2/23/2026 1:30 PM
Estimated Construction Cost
$100,000
Contact/Planholders List
This list includes engineers, contractors, subcontractors, suppliers, and others associated with this project. You MUST sign up to receive addenda and revisions, project notifications and other project information.
Public Notices
2/23/2026 - Bid Results
On February 23, 2026, at 1:30pm, bids were received for the JVWTP Backwash Outlet Valve Replacement project. The bid opening sheet is available on the JVWCD website. The apparent low bidder is Corrio Construction. This project will be presented to the JVWCD Board of Trustees on March 11th for consideration to award the project.
2/18/2026 - New Addendum
Addendum #1, correcting errors in the drawings, is now available from the JVWCD website. The bid due date and time remain 1:30 pm on February 23, 2026.
2/2/2026 - Bid Documents Available
The bid documents for the Jordan Valley Water Treatment Plant Backwash Outlet Valve Replacement project are now available on the JVWCD website. Bids are due on February 23, 2026 at 1:30 pm.
Contract Documents and Project Information
| Date | Type | Description | Download |
|---|---|---|---|
| 2/23/2026 | Bid Results | Bid Results | Download |
| 2/18/2026 | Addendum | Addendum #1 | Download |
| 2/3/2026 | Bid Documents | Specifications | Download |
| 2/2/2026 | Drawings | Drawings | Download |
| 2/2/2026 | Bid Documents | Bid Documents | Download |