Jordan Aqueduct Cylinder Wall Spot Repairs

Engineering project details, documents, and contact information can be found below.

Jordan Aqueduct Cylinder Wall Spot Repairs

Project Information

Project Name
Jordan Aqueduct Cylinder Wall Spot Repairs
Project Type
Pipeline
Project Manager
Travis Christensen
Project Description
This project includes removal of interior mortar lining of
fifteen locations on the Jordan Aqueduct Reach 1, a 78-inch weld steel, mortar lined and
coated pipe, which were identified to have wall loss from a 2020 condition assessment.
JVWCD’s consultant will verify wall loss in these locations using nondestructive methods.
If wall loss is occurring on the interior of the pipe, an interior patch will be placed and the
interior mortar coating will be repaired. If wall loss is measured and not found on the
interior of the pipe, the exterior of the pipe will be exposed, corrosion treated, an exterior
patch will be placed and the interior and exterior linings will be repaired. Three exterior
joints on the Jordan Aqueduct Reach 1 will be exposed and inspected. A section of the
Jordan Aqueduct Reach 4 will also be exposed to investigate a current drop if the
aqueduct’s cathodic protection current.
Bids Due
10/31/2025 2:00 PM

Contact/Planholders List

This list includes engineers, contractors, subcontractors, suppliers, and others associated with this project. You MUST sign up to receive addenda and revisions, project notifications and other project information.

Download List

Public Notices

10/20/2025 - Bid Documents Available

Bid documents for the Jordan Aqueduct Cylinder Wall Spot Repairs Project are now available on the JVWCD Website. Please note that bids for this project are due on October 31, 2025 at 2:00 pm.

Contract Documents and Project Information

Date Type Description Download
10/20/2025 Bid Documents 01_Bid Documents Download
10/20/2025 Bid Documents 02_Specifications Download
10/20/2025 Bid Documents 03_Drawings and Appendicies Download