5700 West 10200 South Booster Pump Station Upgrades
Project Information
Project Name
5700 West 10200 South Booster Pump Station Upgrades
Project Type
Pump Station
Project Manager
Conor Tyson
Project Description
The 5700 West 10200 South booster pump station was built in 1981 to convey water into JVWCD’s Zone C pressure zone. The existing booster pump station contains four pumps and motors. This pump station now requires increased pumping capacity to meet the rising demand in the area. It is desired to upgrade two of the smaller pumps and motors to meet this demand. The existing power on-site is insufficient to meet these increased demands. This will need to be replaced as part of this project. Additionally, new MCCs will need to be installed for the new motors.
Estimated RFP Release Date
August 2024
Engineering Contract Date
11/7/2024
Proposals Due
9/16/2024
Consultant
AE2S
Bids Due
9/18/2025 3:00 PM
Estimated Construction Cost
$4,500,000 - $6,000,000
Contact/Planholders List
This list includes engineers, contractors, subcontractors, suppliers, and others associated with this project. You MUST sign up to receive addenda and revisions, project notifications and other project information.
Public Notices
9/3/2025 - Announcement
The sign in sheet from the pre-bid meeting held on September 3rd, 2025, is now posted on the JVWCD webpage.
8/25/2025 - Bid Documents Available
Bid documents for the 5700 West 10200 South Booster Pump Station Upgrades Project are now available on the Jordan Valley Water Conservancy District Webpage. Bids are due September 18th at 3:00 pm
Contract Documents and Project Information
Date | Type | Description | Download |
---|---|---|---|
9/3/2025 | Planholders List | Pre-Bid Sign in | Download |
8/25/2025 | Bid Documents | Bid Documents | Download |
8/25/2025 | Drawings | Bid Drawings | Download |