SWGWTP Finished Water Vault HVAC Upgrades

Engineering project details, documents, and contact information can be found below.

SWGWTP Finished Water Vault HVAC Upgrades

Project Information

Project Name
SWGWTP Finished Water Vault HVAC Upgrades
Project Type
Treatment
Project Manager
Adam Cossey
Project Description
The SWGWTP has a drywell for the finished water pumps.  This vault needs ventilation for operator safety.  This project adds fans and ducting to provide the desired ventilation.
Consultant
JVWCD
Estimated Bid Documents Available
7/15/2026
Bids Due
7/24/2026 4:00 PM
Estimated Construction Cost
30,000

Contact/Planholders List

This list includes engineers, contractors, subcontractors, suppliers, and others associated with this project. You MUST sign up to receive addenda and revisions, project notifications and other project information.

Download List

Public Notices

7/20/2026 - Bid Documents Addendum

Addendum 2 to the Finished Water Pump Vault Ventilation Project has been issued.  It adds a third fan, FRP grating and a flood switch to the project.  

The bid date and time is extended one week until 7/31/2026 at 4:00 pm.

7/10/2026 - Bid Documents Addendum

This addendum lists project requirement changes. Bid due dates remain unchanged 7/24/2026 at 4 pm

6/30/2026 - Announcement

Bid Documents for the SWGWTP Finished Water Vault HVAC Upgrades Improvements are now available. This project will add two fans, exhaust pipes, and additional equipment at the site. Bid documents are available online through www.jvwcd.gov under the Engineering Projects link. There is a non-mandatory pre-bid meeting at 9:30 AM on July 9th 2026. At the site of work.

Contract Documents and Project Information

Date Type Description Download
7/20/2026 Addendum Addendum 2 Download
7/10/2026 Addendum Addendum 1 Documents bid due dates remain unchanged as 7/24/2026 at 4:00 pm Download
6/30/2026 Bid Documents Volume 1 bid documents Download
6/30/2026 Drawings Volume 2 Drawings Download