JA-2 Flow Control Structure Improvements

Engineering project details, documents, and contact information can be found below.

JA-2 Flow Control Structure Improvements

Project Information

Project Name
JA-2 Flow Control Structure Improvements
Project Type
Pipeline
Project Manager
John Kahle
Project Description
This project includes replacing two 30" venturi style flow meters, two 30" butterfly valves with actuators, one 42" venturi flow meters, and one 42" butterfly valve with actuator. This work will involve modifications to the existing piping all located inside an underground vault. Along with the work at the flow control structure, a 66" outlet valve also located at the terminal reservoir will be replaced with a new actuator.
Estimated RFP Release Date
N/A
Consultant
Owner
Estimated Bid Documents Available
September 2025

Contact/Planholders List

This list includes engineers, contractors, subcontractors, suppliers, and others associated with this project. You MUST sign up to receive addenda and revisions, project notifications and other project information.

Download List

Public Notices

There are no public notices at this time.

Contract Documents and Project Information

There are no documents attached to this project.