Jordan Aqueduct, Reach 4 Blow-Off Drain

Engineering project details, documents, and contact information can be found below.

Jordan Aqueduct, Reach 4 Blow-Off Drain

Project Information

Project Name
Jordan Aqueduct, Reach 4 Blow-Off Drain
Project Type
Pipeline
Project Manager
Conor Tyson
Project Description
Attach to an existing blow-off line and construct a new PVC pipeline about 700 feet from existing blowoff to a UDOT storm channel.
Consultant
JVWCD
Estimated Bid Documents Available
August 2025
Bids Due
9/11/2025
Estimated Construction Cost
$90,000-180,000

Contact/Planholders List

This list includes engineers, contractors, subcontractors, suppliers, and others associated with this project. You MUST sign up to receive addenda and revisions, project notifications and other project information.

Download List

Public Notices

8/29/2025 - Bid Documents Addendum

Addendum #1, answering questions and providing additional information requested at the pre-bid meeting, is now available on the website. The bid due date and time remain unchanged.

8/27/2025 - Announcement

The sign in sheet from the pre-bid meeting held on August 27th, 2025, is now posted on the JVWCD webpage.

8/20/2025 - Bid Documents Available

Bid documents for the Jordan Aqueduct, Reach 4 Blow-off Drain Project are now available on the Jordan Valley Water Conservancy District Webpage. Bids are due September 11th at 4:00 pm

Contract Documents and Project Information

Date Type Description Download
8/29/2025 Addendum Addendum #1 Download
8/27/2025 Planholders List Pre-Bid Sign in Download
8/20/2025 Bid Documents Bid Documents Download
8/20/2025 Drawings Bid Drawings Download
8/20/2025 Bid Documents Technical Specifications Download